Logo
  • ABOUT COMPANY
    • SPECIALIZATION
    • OUR TEAM
    • CERTIFICATES
    • BUSINESS RECOGNITION
  • PROJECTS
  • MEDIA
    • NEWS
    • PRESS
    • BROCHURES
    • RESEARCH ARTICLES
  • CONTACTS
CLIENT
Directorate for construction of very important objects of Khyakimlik of the city of Ashkhabad
GENERAL CONTRACTOR
SC PO Vozrozhdenie
DESIGN STAGE
2010 – 2011
CONSTRUCTION STAGE
2010 – 2011
TECHNICAL FEATURES
  • bridge diagram — 42+63+42 m
  • bridge length — 177.85 m
  • limiting dimension – 37.95 m
  • 3 traffic lanes in one direction with a width of 3.75 m, 4 traffic
  • lanes in the other direction, dividing strip of the width of 5m
  • steel total weight — 1291.2 tonnes total weight of reinforced
  • concrete for construction of piers – 6 504.88 tonnes
SCOPE OF WORK
  • general design
  • development of architectural solutions

Working Documentation:
  • development of technology of construction
  • development of SAC&D
  • development of Method Statement
  • development of Construction MS
  • fulfillment of calculations with development of specific technical
  • specifications for designing of seismic structures
  • technical inspection
  • participation in tests
  • field supervision
  • undergoing of expert examination of Turkmenistan
SIMILAR OBJECTS
BRIDGE OVER THE ISET RIVER WITH TRANSPORT AND PEDESTRIAN APPROACHES IN THE TOWN OF KAMENSK-URALSKY
BRIDGE OVER THE KARAKUM RIVER ON PK160+50 OF GYAMI, ASHKHABAD
Logo
Dynamic Heading