CLIENT
Directorate for construction of very important objects of Khyakimlik of the city of Ashkhabad
GENERAL CONTRACTOR
SC PO Vozrozhdenie
DESIGN STAGE
2010 – 2011
CONSTRUCTION STAGE
2010 – 2011
TECHNICAL FEATURES
- bridge diagram — 42+63+42 m
- bridge length — 177.85 m
- limiting dimension – 37.95 m
- 3 traffic lanes in one direction with a width of 3.75 m, 4 traffic
- lanes in the other direction, dividing strip of the width of 5m
- steel total weight — 1291.2 tonnes total weight of reinforced
- concrete for construction of piers – 6 504.88 tonnes
SCOPE OF WORK
- general design
- development of architectural solutions
Working Documentation:
- development of technology of construction
- development of SAC&D
- development of Method Statement
- development of Construction MS
- fulfillment of calculations with development of specific technical
- specifications for designing of seismic structures
- technical inspection
- participation in tests
- field supervision
- undergoing of expert examination of Turkmenistan
SIMILAR OBJECTS
BRIDGE OVER THE KARAKUM RIVER ON PK160+50 OF GYAMI, ASHKHABAD