Logo
  • ABOUT COMPANY
    • SPECIALIZATION
    • OUR TEAM
    • CERTIFICATES
    • BUSINESS RECOGNITION
  • PROJECTS
  • MEDIA
    • NEWS
    • PRESS
    • BROCHURES
    • RESEARCH ARTICLES
  • CONTACTS
CLIENT
JSC ‘Novgorogavtodor’
DESIGN STAGE
2009 — 2010
CONSTRUCTION STAGE
2009 — 2014
STRUCTURES WITHIN MOTORWAY
Motorway located on intersection of streets, lanes as well as with flyovers plus junctions by Volkhkov River and Donets Creek

Transportation interchange No.1
The junction is designed on intersection of Sirkovskoe Shosse with transportation round about and Sirkovskoe Shosse Viaduct


Transportation interchange No.2
Structure is fulfilled on intersection of Energetikov Lane with passage arrangement under the flyover


Transportation interchange No.3
Junction is placed on busy intersection of Rabochaya Street


Transportation interchange No.4 with curved exits
Site is designed on intersection of Bolshaya Sankt-Petersburgskaya Street with cozy transportation exits arrangement


Bridge over the Volkhov River
Basic features:
bridge schema: 42 + 6х63 + 84 + 99 + 84 + 63 + 84 + 63 m
total length – 904 m
carriageway width – 29.0 m
2 lanes per each direction with width — 4m and 3.5 m
4 one way barriers having width per 0.5 m
dividing lane width – 2.0 m
2 pedestrian lanes with width per – 3 m
clearance — 2хГ – 9.5+2х3.0 m
pier 13 is arranged via customized staircases
decks – composite RC continuous girders
total RC volume– 33,306 m³
total steel weight – 6,779t
Navigation span of 9m height and 90m width in accordance with Technical Specifications of ‘Volgo-Balt Shipping Company’


Right Bank Viaduct
Junction No.5
Located within intersection of Soviet Army Street


Junction No.6
Placed within intersection of Bolshaya Moskovskaya Street (PK-61) on the right river bank. The above viaduct crosses the highway with arranged comfortable exits for motorists. Single span reinforced concrete bridge crossing over the Donets Creek.


Junction No.7
One-level structure within Khutin Motorway (PK-78)


Junction No.8
Located within intersection of Derzhavina Street with arranged cycling lanes and pedestrian lanes (PK 55 + 35.78) plus comfortable elevators for handicapped people
SCOPE OF WORK
‘Design Documentation’ Stage
  • general design
  • design of main structures
  • roadway design
  • development of architectural conception
  • illumination design
  • SAS&D and construction MS design
  • technical supervision
  • Federal Expertise passing
SIMILAR OBJECTS
BRIDGE OVER THE KARAKUM RIVER ON PK160+50 OF GYAMI, ASHKHABAD
BRIDGE OVER THE VOLKHOV RIVER IN VELIKY NOVGOROD
Motorway road ‘Veliky Novgorod – Khutin’ up to Highway ‘Veliky Novgorod – Luga’ with bridge crossing over the Volkhov River.
Logo
Dynamic Heading