DESIGN STAGE
2012 – 2013
CONSTRUCTION STAGE
2012 – 2013
TECHNICAL FEATURES
  • scheme of superstructures: 55m + 96m + 124m + 96m + 55m
  • bridge total length – 439.2 m
  • bridge width – 29.3 m
  • clear headways of bridge: 1.0m + 2×3.5m + 7.5m + 2×3.5m + 1.0m = 23.5m
SCOPE OF WORK
  • general design

Stage ‘Work documentation’:
  • design of main structures
  • development SAC&D
  • design of road works
  • relocation of utilities
  • design of outdoor lighting electric power supply
  • development of cost estimate documentation
  • technical support of construction
  • development of strengthening the superstructure with high-tensile reinforcement
  • calculation for test loads
  • field supervision
SIMILAR OBJECTS
BRIDGE OVER THE VOLKHOV RIVER IN VELIKY NOVGOROD
BRIDGE OVER THE VOLGA RIVER IN THE CITY OF TVER 
(EASTERN BRIDGE)
Type of construction — overhaul repair of unsafe motor road bridge. The bridge is a five-span reinforced concrete beam continuous superstructure with a roadway above, on the monolithic reinforced concrete piers on pile foundations. The superstructure main beams are of a variable height due to curved outline of the bottom chord.
The bridge superstructures are prefabricated ones. Box-like segments of the superstructure are combined together on glue joints via their compression with bundles of high-strength wire. In cross direction, the superstructure consists of two main box beams connected to each other with a monolithic section and carriageway reinforced concrete slab.
The carriageway has 4 traffic lanes (2 in each direction) and 2 lines of tram tracks along the bridge axis. Intermediate piers consist of 2 columns not connected between each other. The bridge abutments are of earth-covered type. The main decision made during overhaul repair of the unsafe bridge is carrying out of works on strengthening the superstructures with the outer high-tensile reinforcement located inside the box girders of the spans.