CLIENT
Federal Department of Highways
DESIGN STAGE
2021
CONSTRUCTION STAGE
2024
TECHNICAL FEATURES
- road type – highway;
- type of the road surfacing- capital, asphalt- concrete;
- total length – 3,047 km;
- lanes quantity - 4;
- lanes width – 15.0 (2х4.0+2х3.5) m;
- width of the road median – 2.65 m;
- width of the shoulder– 4.0/2.0 m;
- width of the earthwork– 32.0 /88.0 m;
- quantity of transportation interchanges – 1.
SCOPE OF WORK
- general design;
- scope of works:
- geodetic survey;
- geological survey;
- meteorological survey;
- ecological survey;
- economical assessment;
- area clearance out of explosive objects;
- archaeological and historical-cultural research;
- survey of existing cross roads;
- design documentation correction.
- site technical supervision.
SIMILAR OBJECTS
EASTERN HIGHWAY
Motorway ‘Eastern Highway’ plus flyover with transportation interchange of several levels within intersection of railroad Tumen-Surgut-Novy Urengoy.
Our construction site includes motorway being designed as a detour of city center up to industrial part of Novy Urengoy (South-Eastern part of the city) and further up to Northern part of Eastern side of Urengoy, which should make transportation status quo of the city much more comfortable for local inhabitants to reach any district of the city by means of railroad crossing and over the viaduct of Sede-Yaha. The entire length of the aforementioned construction site should be about 3,047 km.
CONSTRUCTION SITE INCLUDES:
artificial structures;
two viaducts over the railroad being designed as a transportation interchange;
bridge crossing over the Sede-Yaha River;
new watercourse of Varengayaha River.
WHAT MAKES IT UNIQUE ONE:
New site is located in severe permafrost area of frozen hummocky swamps, frozen polygonal peat lands together with birch-larch plus low-coniferous forests and woodlands. Swamp system of the area has specific structure.
The section of being designed motorway is composed mainly of thawed soils, permafrost soils and sand of medium hard-frozen weak-ice massive cryogenic structure within depth of about 9 -15 m.
Our construction site includes motorway being designed as a detour of city center up to industrial part of Novy Urengoy (South-Eastern part of the city) and further up to Northern part of Eastern side of Urengoy, which should make transportation status quo of the city much more comfortable for local inhabitants to reach any district of the city by means of railroad crossing and over the viaduct of Sede-Yaha. The entire length of the aforementioned construction site should be about 3,047 km.
CONSTRUCTION SITE INCLUDES:
artificial structures;
two viaducts over the railroad being designed as a transportation interchange;
bridge crossing over the Sede-Yaha River;
new watercourse of Varengayaha River.
WHAT MAKES IT UNIQUE ONE:
New site is located in severe permafrost area of frozen hummocky swamps, frozen polygonal peat lands together with birch-larch plus low-coniferous forests and woodlands. Swamp system of the area has specific structure.
The section of being designed motorway is composed mainly of thawed soils, permafrost soils and sand of medium hard-frozen weak-ice massive cryogenic structure within depth of about 9 -15 m.