Logo
  • ABOUT COMPANY
    • SPECIALIZATION
    • OUR TEAM
    • CERTIFICATES
    • BUSINESS RECOGNITION
  • PROJECTS
  • MEDIA
    • NEWS
    • PRESS
    • BROCHURES
    • RESEARCH ARTICLES
  • CONTACTS
CLIENT
Petrokom Ltd, Saint Petersburg
CONSTRUCTION STAGE
2011
TECHNICAL FEATURES
  • height of pylon –58 m;
  • length of span – 130 m;
  • technological load – Two heating tubes 1.2 m.
SCOPE OF WORK
  • design of pylon construction technology;
  • design of SAC&D;
  • Method Statement on pylon construction.
TECHNOLOGICAL CABLE-STAYED VIADUCT OVER THE DUDERGOFSKIY CANAL IN ST. PETERSBURG
Cable – Stayed Technological Viaduct with main span of 130m is being crossing Dudergofskiy Channel with sibling heating tubes of  1020 mm above with single inclined pylon. The structure of cable-stayed bridge supporting heating main has no analogues in Russia. Pylon by height 58 m is inclined to the earth is hot found in other similar projects.
SIMILAR OBJECTS
VIADUCT ALEXANDROVSKAYA FERMA, SAINT PETERSBURG
BRIDGE CROSSING OVER THE KALININGRAD BAY (KÖNIGSBERG MEERBUSEN)
CABLE STAYED BRIDGE CROSSING OVER THE SEVASTOPOL BAY
Logo
Dynamic Heading