CLIENT
State-owned Company Russian Motorway Roads
GENERAL CONTRACTOR
AO KROKUS
GENERAL DESIGNER
AO Institute Giprostroymost Saint-Petersburg
DESIGN STAGE
2016 — 2018
CONSTRUCTION STAGE
2016 — 2021
TECHNICAL FEATURES
Construction Indices Lot No.1
  • Russian Grade Road IА, length — 49,5 km
  • Designated speed — 140 km/h
  • Lanes quantity — 4 pcs.; 6 pcs (Stage II PK 2.417 + 09.56 — PK2.912 + 00)
  • Lane width — 3,75m
  • Carriageway width — 2×7,5 м ; 2х11,25 м (Stage II PK 2.417 + 09.56 — PK2.912 + 00)
  • Emergency lane — 3,75m
  • Deviding lane — 6,0m
  • Junctions of different levels — 4 pcs; 5 pcs (Stage II PK 2.417 + 09.56 — PK2.912 + 00)
  • Bridge crossings— 50 pcs; 53 pcs (Stage II PK 2.417 + 09.56 — PK2.912 + 00)

Standard Temporary vertical loads:
  • per artificial structures А14, Н 14
  • per road pavment 115 kN
SCOPE OF WORK
  • Set of measures preparation reckoning state-of- art structures with utility lines optimization, regarding 1-st Stage of construction with volume required for technical decisions approval via the board of Government Technical Experts Committee.
  • Approval of optimized solutions of ‘Avtodor’ Technical Experts together with presentation materials.
  • Total set of works completion concerning work documentation preparation regarding construction site Central Ring Road of Moscow Region (toll road after the completion) including optimization options, approved by State-owned Company Avtodor.
SIMILAR OBJECTS
CENTRAL RING ROAD MOTORWAY, MOSCOW REGION
CENTRAL RING ROAD OF MOSCOW REGION
Construction of Central Ring Road of Moscow Region (toll road after the completion). Initial Stage of construction. Lot No.1
Logo
Dynamic Heading