CLIENT
SC Perm concession company
GENERAL DESIGNER
SC Institute Stroyproject
DESIGN STAGE
2018 – 2020
CONSTRUCTION STAGE
2019 – 2023
TECHNICAL FEATURES
New steel girder bridge crossingtogether with reconstruction of the old bridge over the Chusova River:
- bridge schema: (4х84)+(84+126+5х147+126+84) m;
- length of the old bridge– 1, 4 m., total length of the new bridge – 1,506.02 m;
- clearance – 11,5 m- (1.5+3.75+4.0+1.5);
- total area – 22, 560 m2
SCOPE OF WORK
Stage DD:
Stage WD:
- general design;
- design of transportation interchanges;
- main structures design;
- approaches design and reconstruction;
- construction design;
- estimation of motorway section;
- federal expertise.
Stage WD:
- new piers development;
- SAC&D design;
- old bridge reconstruction;
- rail road with new overpass design.
SIMILAR OBJECTS
BRIDGE CROSSING OVER THE CHUSOVAYA RIVER, PERM
Reconstruction
Construction, reconstruction and maintenance of motorway roads ‘Perm-Berezniki’ 020+639-022+390, 022+390-025+768 and ‘Perm Eastern detour’ 000+000-009+753 1. Motorway ‘Perm-Berezniki’ 022+390 — 025+768.
The beginning of the abovementioned Federal Highway is located within the territory of Perm City along the Chusova River bank.
Total length of the construction site is – 3.62 km, including the bridge crossing of 1.5 km.
The beginning of the abovementioned Federal Highway is located within the territory of Perm City along the Chusova River bank.
Total length of the construction site is – 3.62 km, including the bridge crossing of 1.5 km.