CLIENT
Department of construction in Ashkhabad
GENERAL CONTRACTOR
NP ‘Vozrozhdenie’
DESIGN STAGE
2010 – 2012
CONSTRUCTION STAGE
2011 – 2013
TECHNICAL FEATURES
- Total bridge schema —(42+63+42) m
- Bridge length — 166 m
- Dimension: Г= 28 m, (1.0+3х3.5+5.0+3х3.5+1.0) m
- Width of both sidewalks – 0 m;
- 3 one way traffic lanes — width of 5 m, 3 lanes in the opposite way, road divider — width of 5 m
- Total weight of deck steel structures – 850.7 t
- Entire weight of deck RC – 2,680.8 t
- Overall weight of RC of foundations and pier bodies – 18,958.8 t
Retaining walls
- Total weight of RC of foundations and retaining walls – 4,747.5 t
SCOPE OF WORK
- General Design
- Design of architectural solutions
- Working Project Stage
- Design of Construction Technology
- SAS&D design
- Design of MS
- Construction MS design
- Analytical assessment of seismic conditions
- Technical inspection
- Procedure of testing fulfillment
- Designer supervision
- Expert examination of Turkmenistan
SIMILAR OBJECTS
CHOGANLY BRIDGE OVER THE KARAKUM RIVER NEAR A. NIYAZOVA PROSPECT, ASHKHABAD, REPUBLIC OF TURKMENISTAN