Logo
  • ABOUT COMPANY
    • SPECIALIZATION
    • OUR TEAM
    • CERTIFICATES
    • BUSINESS RECOGNITION
  • PROJECTS
  • MEDIA
    • NEWS
    • PRESS
    • BROCHURES
    • RESEARCH ARTICLES
  • CONTACTS
CLIENT
Department of construction in Ashkhabad
GENERAL CONTRACTOR
NP ‘Vozrozhdenie’
DESIGN STAGE
2010 – 2012
CONSTRUCTION STAGE
2011 – 2013
TECHNICAL FEATURES
  • Total bridge schema —(42+63+42) m
  • Bridge length — 166 m
  • Dimension: Г= 28 m, (1.0+3х3.5+5.0+3х3.5+1.0) m
  • Width of both sidewalks – 0 m;
  • 3 one way traffic lanes — width of 5 m, 3 lanes in the opposite way, road divider — width of 5 m
  • Total weight of deck steel structures – 850.7 t
  • Entire weight of deck RC – 2,680.8 t
  • Overall weight of RC of foundations and pier bodies – 18,958.8 t

Retaining walls
  • Total weight of RC of foundations and retaining walls – 4,747.5 t
SCOPE OF WORK
  • General Design
  • Design of architectural solutions
  • Working Project Stage
  • Design of Construction Technology
  • SAS&D design
  • Design of MS
  • Construction MS design
  • Analytical assessment of seismic conditions
  • Technical inspection
  • Procedure of testing fulfillment
  • Designer supervision
  • Expert examination of Turkmenistan
SIMILAR OBJECTS
BRIDGE CROSSING OVER THE CHUSOVAYA RIVER, PERM
BRIDGE CROSSING OVER THE CHUSOVAYA RIVER, PERM
CHOGANLY BRIDGE OVER THE KARAKUM RIVER NEAR A. NIYAZOVA PROSPECT, ASHKHABAD, REPUBLIC OF TURKMENISTAN
Logo
Dynamic Heading