CLIENT
AO ‘DSK Avtoban’
DESIGN STAGE
2016 – 2017
TECHNICAL AND ECONOMIC FEATURES
- lot length – 105.3km
- designated speed – 140km/h
- bridges, viaducts and wildlife crossings – 54 pcs
- multilevel junctions – 7 pcs
- underground pedestrian crossing — 1 piece
Construction Stage I
- width of embankment – 28.5 — 35m
- carriageway width – 4 х 3.75m
Construction Stage II
- width of embankment – 36 — 42.5m
- carriageway width – 6 х 3.75m
Track
- Lot No.3 from Motorway М – 10C ‘Stolitsa’
- up to Motorway М–7 ‘Volga.’ Two stages of construction are being performed simultaneously
Schema of Construction Stage I
- 1 + 2х3.75 + 4 + 2х3.75 + 1m
- lanes quantity – 4 pcs
Schema of Construction Stage II
- 1 + 3х3.75 + 4 + 3х3.75 + 1m
- lanes quantity – 6 pcs
COMPOSED STRUCTURES PER TRACK:
- Flyover on PK 311+51.96
- Flyover on PK 352+65.19
- Flyover on PK 382+88.55
- Flyover on PK 389+93.00
- Flyover on PK 405+54.10
- Flyover on PK 419+51.40
- Flyover across MMK on PK 443+27.00
- Flyover on PK 491+00.93
- Flyover on PK 506+48.10
- Flyover on PK 520+16.93
- Flyover on PK 524+55.00
- Flyover on PK 543+07.75
- Flyover on PK 545+60.85
- Flyover on PK 550+55.10
- Flyover on PK 554+77.28
- Flyover on PK 563+04.36
- Flyover on PK 712+17.50
- Flyover on PK 731+28.69
- Flyover on PK 741+51.14
- Flyover on PK 757+95.00
- Flyover on PK 778+34.41
- Flyover on PK 833+98.00
- Flyover on PK 846+53.66
- Flyover on PK 850+04.80
- Flyover on PK 910+10.72
- Flyover on PK 945+85.50
- Flyover on PK 978+39.20
- Flyover on PK 985+26.36
- Flyover on PK 1014+50.00
- Flyover on PK 1031+78.60
- Flyover on PK 1064+50.00
- Flyover on PK 1117+00.00
- Flyover on PK 1150+04.30
- Flyover on PK 1415+12.04
Bridges:
- Bridge over the Moscow Channel on PK 258+58.93
- Bridge over a creek on PK 283+50.00
- Bridge over a creek on PK 368+40.60
- Bridge over the Kakotka River on PK 386+07.00
- Bridge over the Olshanka River on PK 412+96.20
- Bridge over the Vyaz River on PK 474+05.20
- Bridge over a creek on PK 719+92.77
- Bridge over the Prorvanikha River on PK 735+83.60
- Bridge over the Vorya River on PK 816+20.00
- Bridge over the Pruzhenka River on PK 930+12.93
- Bridge over Chernogolovka River on PK 1,021+13.07
- Bridge over a lake on PK 1,037+28.16
- Bridge over the Zagrebka River on PK 1,086+71.83
- Bridge over the Klyazma River on PK 1,411+46.90
- Wildlife and pedestrian crossings:
- Wildlife crossing on PK 373+14.00
- Wildlife crossing on PK 432+75.00
- Underground pedestrian crossing on PK 705+25.00
- Wildlife crossing on PK 876+75.00
- Drainage pipe on PK 1,079+3.00
SCOPE OF WORK
- paperwork analysis with optimization
- documentation design ‘Technological and structural features of linear site’
- main structures design
- MS issue
- SAC&D design
Stage ‘Work Documentation’:
- main structures design
- construction technology development
SIMILAR OBJECTS
CENTRAL RING ROAD MOTORWAY, MOSCOW REGION
Construction performance of Central Ring Road Motorway, Moscow Region, Lot No 3.