FEDERAL CLIENT
Federal Enterprise ‘Аvtodor’
GENERAL CONTRACTOR
‘Transstroymehanizaciya’
DESIGN STAGE
2020 – 2022 
CONSTRUCTION STAGE
2021 – 2024 
TECHNICAL FEATURES
  • bridge schema:(117.3 + 126.0 + 3х155.0 + 126.0 + 97.3) + (97.3 + 8х126.0 + 97.3) + (97.3 + 8х126.0 + 97.3)
  • total length: 3362.03 m
  • carriageway clearance: 2(Г-10.5) m
  • bridge width: 25.0 m
  • lanes quantity: 4 pcs
SCOPE OF WORK
Stage DD:
  • new bridge design;
  • traffic management design;
  • engineering communication rearrangement;
  • external light design, power supply, drainage arrangement, navigation lights and alarm system including  transportation system safeguard;
  • design of structures included in the infrastructure of a linear object;
  • construction organization development;
  • karsts protection measures;
  • environment protection measures;
  • fire safety measures;
  • health monitoring during construction period;
  • health monitoring during service period;
  • estimation documents preparation.

Stage WD:
  • technical supervision
BRIDGE OVER THE VOLGA RIVER
Bridge crossing over the Volga River was conceived as a part of М-12 Federal Highway ‘Moscow - Nizhniy Novgorod – Kazan’, which should link Liashevsky and Verhniuslonsky Districts, Kazakhstan.
The site of М-12 ‘Moscow – Nizhniy Novgorod – Kazan’ is reckoned under construction now. The abovementioned Lot is Stage VIII 663 – 729 km including new girder bridge over the Volga River, Republic of Tatarstan (from intersection of P241 Federal Highway ‘Kazan -Buinsk – Ulianovsk’ up to local road ‘Sorochy Gory - Shaly).