Logo
  • ABOUT COMPANY
    • SPECIALIZATION
    • OUR TEAM
    • CERTIFICATES
    • BUSINESS RECOGNITION
  • PROJECTS
  • MEDIA
    • NEWS
    • PRESS
    • BROCHURES
    • RESEARCH ARTICLES
  • CONTACTS
CLIENT
Federal Enterprise ‘Аvtodor’
CONTRACTOR
‘Volgogradstroy Ltd’
DESIGN STAGE
2020 – 2023   
CONSTRUCTION STAGE
2021  – 2024    
TECHNICAL FEATURES
  • bridge schema: 6х84.0 m
  • length of the bridge: 517.2 m
  • clearance: 2(Г-10.5)
  • lanes quantity: 4 pcs
SCOPE OF WORK
Stage DD:
  • bridge design development
  • traffic management design
  • utility lines rearrangement
  • external illumination design, power supply, drainage, navigation lights arrangement, including transportation safety measures
  • linear structures design
  • construction arrangement design
  • measures against karst factors
  • environment protection measures
  • fire safety measures
  • structural monitoring per construction stage
  • monitoring performance during service stage
  • estimate development.

Stage WD:
  • technical supervision
BRIDGE OVER THE SVIYAGA RIVER
Bridge crossing over the Sviyaga River is being conceived as a part of  М-12 Highway ‘Moscow– Nizhny Novgorod – Kazan', Stage VII 586 –663 km in Chuvash Republic, Tatarstan. The above structure is being installed within intersection of А-151 Federal Highway ‘Civilsk – Ulyanovsk’ up to the subsequent Highway Р-241 ‘Kazan – Buinsk – Ulyanovsk’ Stage VII.III started from Bolshie Kaybitsy Settlement up to Federal Highway Р-241.
The bridge over the Sviyaga River within the Federal high-speed Highway M-12 "Moscow - Nizhny Novgorod – Kazan". It connects the Kaibitsky, Apastovsky and Verkhneuslonsky Districts of Tatarstan.
SIMILAR OBJECTS
TUCHKOV BRIDGE IN SAINT PETERSBURG
TUCHKOV BRIDGE IN SAINT PETERSBURG
BLAGOVESHENSKY BRIDGE SAINT PETERSBURG
BLAGOVESHENSKY BRIDGE SAINT PETERSBURG
RECONSTRUCTION OF BRIDGE ‘VISOKIY’ IN KALININGRAD CITY
RECONSTRUCTION OF BRIDGE ‘VISOKIY’ IN KALININGRAD CITY
Logo
Dynamic Heading