Logo
  • ABOUT COMPANY
    • SPECIALIZATION
    • OUR TEAM
    • CERTIFICATES
    • BUSINESS RECOGNITION
  • PROJECTS
  • MEDIA
    • NEWS
    • PRESS
    • BROCHURES
    • RESEARCH ARTICLES
  • CONTACTS
CLIENT
Federal Enterprise ‘Аvtodor’
CONTRACTOR
‘Volgogradstroy Ltd’
DESIGN STAGE
2020 – 2023   
CONSTRUCTION STAGE
2021  – 2024    
TECHNICAL FEATURES
  • bridge schema: 6х84.0 m
  • length of the bridge: 517.2 m
  • clearance: 2(Г-10.5)
  • lanes quantity: 4 pcs
SCOPE OF WORK
Stage DD:
  • bridge design development
  • traffic management design
  • utility lines rearrangement
  • external illumination design, power supply, drainage, navigation lights arrangement, including transportation safety measures
  • linear structures design
  • construction arrangement design
  • measures against karst factors
  • environment protection measures
  • fire safety measures
  • structural monitoring per construction stage
  • monitoring performance during service stage
  • estimate development.

Stage WD:
  • technical supervision
BRIDGE OVER THE SVIYAGA RIVER
Bridge crossing over the Sviyaga River is being conceived as a part of  М-12 Highway ‘Moscow– Nizhny Novgorod – Kazan', Stage VII 586 –663 km in Chuvash Republic, Tatarstan. The above structure is being installed within intersection of А-151 Federal Highway ‘Civilsk – Ulyanovsk’ up to the subsequent Highway Р-241 ‘Kazan – Buinsk – Ulyanovsk’ Stage VII.III started from Bolshie Kaybitsy Settlement up to Federal Highway Р-241.
The bridge over the Sviyaga River within the Federal high-speed Highway M-12 "Moscow - Nizhny Novgorod – Kazan". It connects the Kaibitsky, Apastovsky and Verkhneuslonsky Districts of Tatarstan.
SIMILAR OBJECTS
TUCHKOV BRIDGE IN SAINT PETERSBURG
BLAGOVESHENSKY BRIDGE SAINT PETERSBURG
RECONSTRUCTION OF BRIDGE ‘VISOKIY’ IN KALININGRAD CITY
Logo
Dynamic Heading