Logo
  • ABOUT COMPANY
    • SPECIALIZATION
    • OUR TEAM
    • CERTIFICATES
    • BUSINESS RECOGNITION
  • PROJECTS
  • MEDIA
    • NEWS
    • PRESS
    • BROCHURES
    • RESEARCH ARTICLES
  • CONTACTS
CLIENT
Road Administration of Khanty-Mansiysk
GENERAL CONTRACTOR
SC ‘Моstоstroy-11‘
DESIGN STAGE
2019 – 2020 
CONSTRUCTION STAGE
2022 – 2026 
SITE DESCRIPTION
  • total length of the highway 44 km
  • ‘Tube Type’ transportation junctions of double level
  • viaduct over the RR ‘Tyumen-Surgut’ 
  • main bridge over the Ob River

Four small bridges:
Sukhoi Agan channel  - two bridges
Kazennaya Creak
Poloy stream
TECHNICAL FEATURES
  • road  category – II
  • lanes quantity– 4 pcs
  • carriageway schema: 2(G-10.5)
  • technical approaches  - none
SCOPE OF WORK
  • engineering survey
  • DD development
  • economical research
  • WD development
  • technical supervision
BRIDGE CROSSING OVER THE OB RIVER, SURGUT
New Ob River Bridge should be an important link within Federal Highway ‘Moscow —Tyumen — Surgut — Salekhard’

What makes it unique: 
Solid bridge girder with a length of 153 m
SIMILAR OBJECTS
TUCHKOV BRIDGE IN SAINT PETERSBURG
BLAGOVESHENSKY BRIDGE, SAINT PETERSBURG
RECONSTRUCTION OF BRIDGE ‘VISOKIY’ IN KALININGRAD CITY
Logo
Dynamic Heading