CLIENT
Road Administration of Khanty-Mansiysk
GENERAL CONTRACTOR
SC ‘Моstоstroy-11‘
DESIGN STAGE
2019 – 2020
CONSTRUCTION STAGE
2022 – 2026
SITE DESCRIPTION
- total length of the highway 44 km
- ‘Tube Type’ transportation junctions of double level
- viaduct over the RR ‘Tyumen-Surgut’
- main bridge over the Ob River
Four small bridges:
Sukhoi Agan channel - two bridges
Kazennaya Creak
Poloy stream
TECHNICAL FEATURES
- road category – II
- lanes quantity– 4 pcs
- carriageway schema: 2(G-10.5)
- technical approaches - none
SCOPE OF WORK
- engineering survey
- DD development
- economical research
- WD development
- technical supervision
BRIDGE CROSSING OVER THE OB RIVER, SURGUT
New Ob River Bridge should be an important link within Federal Highway ‘Moscow —Tyumen — Surgut — Salekhard’
What makes it unique:
Solid bridge girder with a length of 153 m
What makes it unique:
Solid bridge girder with a length of 153 m