Logo
  • ABOUT COMPANY
    • SPECIALIZATION
    • OUR TEAM
    • CERTIFICATES
    • BUSINESS RECOGNITION
  • PROJECTS
  • MEDIA
    • NEWS
    • PRESS
    • BROCHURES
    • RESEARCH ARTICLES
  • CONTACTS
CLIENT
Committee for the Development of Transport Infrastructure of St. Petersburg
DESIGN STAGE
2021 – 2022 
CONSTRUCTION STAGE
2022 – 2025 
TECHNICAL FEATURES
  • Motorway  road of Class – II;
  • Lanes quantity – 4-6 pcs;
  • Width of tramway road – 7.50 m;
  • Pedestrian lanes are being equipped with bicycle tracks. 
SCOPE OF WORK
  • Set of engineering survey;
  • DD development;
  • Economical research.
BOLSHOI SMOLENSKIY BRIDGE, SAINT-PETERSBURG
It is innovative transportation route with bridge over the Neva River near Kolontay Street. The area of future construction site is being considered from Prospect Obuhovskoy Oborony up to Dalnevostochni Avenue.
  • Motorway with a length of  2,34 km;
  • 3 two level transportation interchanges;
  • Viaduct over the Prospect Obuhovskoy Oborony;
  • Viaduct over the Dalnevostochni Avenue;
  • Bridge crossing over the Neva River near Kolontay Street.

UNIQUENESS
It is new bascule bridge of Saint-Petersburg after more than forty years period.
SIMILAR OBJECTS
TUCHKOV BRIDGE IN SAINT PETERSBURG
BLAGOVESHENSKY BRIDGE, SAINT PETERSBURG
RECONSTRUCTION OF BRIDGE ‘VISOKIY’ IN KALININGRAD CITY
Logo
Dynamic Heading