Logo
  • ABOUT COMPANY
    • SPECIALIZATION
    • OUR TEAM
    • CERTIFICATES
    • BUSINESS RECOGNITION
  • PROJECTS
  • MEDIA
    • NEWS
    • PRESS
    • BROCHURES
    • RESEARCH ARTICLES
  • CONTACTS
CLIENT
FSI Directorate for Construction of vehicle by-road of the city of St. Petersburg
JCS Mostootryad No 19, JSC ‘Mostostroy No 6
DESIGN STAGE
2003 – 2006
CONSTRUCTION STAGE
2004 – 2008
TECHNICAL FEATURES
  • clear headway of bridge — Г (2.0 +2.0 +4х3.75+2.0);
  • camber of arch — 30 m;
  • height of binding beams — 2 m;
  • weight of steel structure — 1,762.7 t;
  • volume of reinforced concrete slab – 1191 m³;
  • total length of cables — 10.503 m;
  • weight of cables — 12.3 t;
  • ‘Maurer Sohne’ bearing members with a loading capacity of 2.000 t.
SCOPE OF WORK
Work Documentation Stage:
  • general design;
  • development of architectural solutions;
  • design of main structures;
  • design of construction technology;
  • design of SAC&D, Method Statement, Construction Method Statement;
  • field supervision.
BELYAYEVSKY BRIDGE OVER THE OKHTA RIVER IN 
SAINT PETERSBURG
The bridge on the ring road around Saint Petersburg in the area from Priozersky highway to «Rossiya» road»: the section from Rzhevka to Shafirovsky prospect (PK 750+00 — PK 795+72.43). Lot 5. The bridge consists of two parallel narrow bridges, each of which consists of two parts along its length: continuous steel-reinforced concrete superstructure 48.4 + 63.0 + 48.4 m and an arch span without transferring the bearing reaction on pier, with a design span of 161.4 m. The arch span is a ‘rigid arch’ combined system without horizontal thrust, with a ‘flexible tie’, and with a roadway on bottom boom.
SIMILAR OBJECTS
BRIDGE OVER ISHYM RIVER IN ASTANA
RECONSTRUCTION OF BRIDGE OVER THE VUOKSA RIVER
KRYMSKY BRIDGE
Logo
Dynamic Heading