CLIENT
Directorate for the Construction of particularly important facilities in the city of Ashgabat
DESIGN STAGE
2009-2011
TECHNICAL FEATURES
- half-through arch bridge
- bridge length — 220 m
- camber of arch — 30 m
- bridge diagram: 1.5 m + 3×3.5 m + 5 m + 3×3.5 m + 1.5 m
ARCHITECTURAL COMPLEX INCLUDES
- girder bridge in section by Andaliba Street
- three spans girder bridge in section by Niyazova Street
- water cascade area
- pedestrian arch bridges
- structures of canopies within water cascade area
SIMILAR OBJECTS
LANDSCAPING OF KARAKUM RIVER EMBANKMENT IN ASHKHABAD
Conception