CLIENT
Department of construction in Ahkhabad City
DESIGN STAGE
‘Design Documentation’ Stage 2009 – 2010
‘Work Documentation’ Stage 2010
CONSTRUCTION STAGE
2009 – 2012
SCOPE OF WORK
  • engineering survey — geodesic plus hydro-geological (control of the survey as a general designer)

‘Design Documentation’ Stage
  • General Design
  • passing of state expertise

‘Work documentation’ Stage
  • development of site architectural decisions
  • design of engineering structures
  • design of roads and traffic interchanges
  • street illumination with electric power supply design
  • landscaping design
  • SAC&D plus construction technology development
  • field supervision
  • technical supervision
  • passing of state expertise
SIMILAR OBJECTS
EASTERN HIGHWAY
HIGHWAYS, BRIDGES, INTERCHANGES AND FLYOVERS IN THE CITY OF ASHKHABAT AND AKHAL VELAYAT
Construction of motorway ‘East-West’ from the intersection of Ring Road with ‘Ashkhabad-Mary’ motorway up to highway ‘Ashkhabad — Turkmenbashi’ with local route to Geokdepe village near Ashkhabad. Traffic interchange at the intersection of South Ring Road up to Turkmenbashi avenue.

FACILITIES AS APART OF THE ROUTE
  • Seven traffic interchanges at the intersections of the existing highways with average area of 1 km² each:
  • Junction at the intersection of Ring Road with the Highway ‘Ashkhabad—Mary’ and railway tracks near the settlement of Gyami
  • Traffic interchange in the area of «PK 160» per connection with bridge structure
  • Transport junction at the intersection of Tretya Pyatiletka Street with Kulieva Street together with the traffic interchange with a new bridge crossing constructed under separate contract
  • Traffic interchange at the intersection of Andaliba Street with Kulieva Street plus connection of the traffic interchange with a new bridge crossing constructed at the site of in-service bridge
  • Traffic junction at the intersection of Niyazova Street and Kulieva Street with linking of the traffic interchange plus the new bridge crossing constructed at the site of the old one
  • Traffic interchange at the intersection of the motorway ‘Ashkhabad – Turkmenbashi’ with the highway toward Geokdepe and railway tracks Ashkhabad – Turkmenbashi
  • Junction at the intersection of the Ring Road Southern part with Turkmenbashi Prospect
  • Two lots of Ring Road 10 km long
  • Three bridge crossings over the Karakum River with approaches and junctions