CLIENT
‘South Coast’ Ltd
DESIGN STAGE
2021
TECHNICAL FEATURES
Mooring Pier #152
Composite mooring pier
Lot #1
Lot #2
Mooring Pier #153
Mooring Pier #153А
Mooring Pier #154
Mooring Pier #155
Western Ramp section:
Mooring Pier #156
Lot #1
Lot #2
Mooring Pier #157
Composite mooring pier
Lot #1
- length - 57.75 m
- width - 4 m (two rows of piled flyover with upper structure of composite RC slabs above the RC cross-beams)
Lot #2
- length - 17.6 m
- width 3 m (concrete mooring pier above the stone foundation)
- year of construction – 1983
Mooring Pier #153
- length - 20 m
- width 3m (gravity type embankment)
- year of construction – 1905
- year of reconstruction 1954
Mooring Pier #153А
- length - 16.0 m, width 3.0 m (gravity type embankment)
- year of construction – 1905
- year of reconstruction 1954
Mooring Pier #154
- length - 39.88 m
- width 3.4 m (passenger embankment out of steel ‘Larsen- V’ sheet piles)
- year of construction – 1983
Mooring Pier #155
- passenger
- length - 49.3/50.4 m
- width 11.0 (two row anchor structure out of ’Larsen III’ sheet piles)
Western Ramp section:
- length – 19.95 m
- width 16.7 m (anchored embankment)
- year of construction – 1958
- year of reconstruction – 1990
Mooring Pier #156
- Passenger embankment
Lot #1
- length - 11.7 m
- width 4m (gravity concrete structure)
Lot #2
- length - 27.6 m
- width 4m (gravity concrete structure)
- year of construction – 1971
Mooring Pier #157
- length – 134.4 m
- passenger (three rows flyover on pre-stressed RC piles with RC upper structure)
- year of construction – 1971
- level of responsibility - II
- class of hydro-technical structure - III
- power supply category - II
SCOPE OF WORK
- general design
SIMILAR OBJECTS
RECONSTRUCTION OF ARTILLERY BAY MOORING PIERS, SEVASTOPOL, RF
Reconstruction
Artillery Bay is one of the Sevastopol bays, located in the center of Sevastopol.