CLIENT
JSC Russian Railways;
JSC Lengiprotrans.
JSC Lengiprotrans.
GENERAL CONTRACTOR
SMT-1 of JSC RZDstroy.
JSC Mostostroy No 6.
JSC Mostostroy No 6.
DESIGN PERIOD
2006 — 2007
CONSTRUCTION PERIOD
2007 — 2009
TECHNICAL FEATURES
The bridge superstructures are made in the form of combined arched metal superstructures without transferring the bearing reaction on pier, with a roadway on bottom boom. Design span is 100 m. The camber of arch is 20 m. The cross section of the superstructure consists of two arches combined by the system of longitudinal andtransverse braces.Basic parameters for two-track bridges:
- design span — 100 m;
- camber of arch — 20 m;
- distance between the arches — 10.5 m;
- weight of steel structures — 1290 t;
- volume of mallet plate’s reinforced concrete — 415 m³.
- design span — 100 m;
- camber of arch — 20 m;
- distance between the arches — 6.1 m;
- weight of steel structures — 770 t;
- volume of mallet plate reinforced concrete — 245 m³.
- design span — 100 m;
- camber of arch — 20 m;
- distance between the arches — 12.7 m;
- weight of steel structures — 1360 t;
- volume of mallet plate reinforced concrete — 510 m³.
- span length was increased from 50 to 100 m;
- under clearance was increased up to 5 m.
SCOPE OF WORK
- development of architectural solutions;
- design of bridge main structures;
- design of construction technology;
- design of SAC&D;
- design of Method Statement;
- design of existing bridge unbuttoning;
- scientific and technical support;
- field supervision.
RAILWAY ‘AMERICAN’ BRIDGES OVER THE OBVODNY CANAL IN SAINT PETERSBURG, RUSSIA
Reconstruction of railway bridges over the Obvodny canal in the direction of Moscow of Octaybrskaya Railway in Saint Petersburg. Five railway bridges:
- one single-track bridge — letter ‘Г’;
- three two-track bridges — letters ‘А’, ‘Б’, ‘В’;
- one vehicle passway combined for a single-track railway — letter ‘E’.
SIMILAR OBJECTS