Logo
  • ABOUT COMPANY
    • SPECIALIZATION
    • OUR TEAM
    • CERTIFICATES
    • BUSINESS RECOGNITION
  • PROJECTS
  • MEDIA
    • NEWS
    • PRESS
    • BROCHURES
    • RESEARCH ARTICLES
  • CONTACTS
CLIENT
Road Administration of Saint Petersburg
GENERAL CONTRACTOR
JSC Lengiprotrans
DESIGN STAGE
2006 — 2008
CONSTRUCTION STAGE
2008
SCOPE OF WORK
  • bridge crossing conception;
  • design of main structures of overpass;
  • technology of construction;
  • design of SAC&D;
  • development of Method Statements (MS);
  • structural monitoring during construction stage and service period;
  • field supervision.
TECHNICAL FEATURES
  • diagram of cable-staed span:  51.2+70.0+182.3+70.0+51.2 m;
  • total length – 713.24 m;
  • length of Cable-staed spans- 424.7 m;
  • width of carriageway – 23.7 m;
  • A-shaped RC pylons;
  • height of pylons — 65 m.
VIADUCT ALEXANDROVSKAYA FERMA, SAINT PETERSBURG
Overpass over RR stations Saint-Petersburg — Sortirovochniy — Moskovskiy Prospekt along Alexandrovskaya Ferma. Structure of overpass fulfilled as continuous steel span of box section with orthotropic slab, all-metal structure of middle span and back spans out of reinforced concrete. Viaduct has curved form withradius of 400 m. Cable-stayed ferms are within plane along overpass axis.
SIMILAR OBJECTS
CABLE STAYED BRIDGE CROSSING OVER THE SEVASTOPOL BAY
CABLE STAYED BRIDGE CROSSING OVER THE SEVASTOPOL BAY
BRIDGE CROSSING OVER THE KALININGRAD BAY (KÖNIGSBERG MEERBUSEN)
BRIDGE CROSSING OVER THE KALININGRAD BAY (KÖNIGSBERG MEERBUSEN)
CABLE-STAYED BRIDGE ON THE HIGHWAY ADLER-MOUNTAIN RESORT ‘ALPICA- SERVICE’
CABLE-STAYED BRIDGE ON THE HIGHWAY ADLER-MOUNTAIN RESORT ‘ALPICA- SERVICE’
Logo
Dynamic Heading