CLIENT
OAO Department of Temporary Service
GENERAL CONTRACTOR
OAO Sibmost
DESIGN STAGE
2011
CONSTRUCTION STAGE
2011 — 2012
TECHNICAL FEATURES
- bridge schema prior to reconstruction: 22.9 + 7 + 7х55 + 22.9m;
- back spans 1-2 & 8-9 are completed of RC;
- middle spans per 55m fulfilled of rivet-welded trusses;
- solid RC abutments;
- natural foundations;
- middle spans 2-7 completed of composite RC structures with foundation wells placed on the depth of 4-4.5m;
- next middle spans 8-9 fulfilled of composite RC structures with foundation wells and boring piles of Ø1.4m placed on the depth of 2.11m;
- bridge schema after reconstruction: 22.9 + 7 + 2х55 + 110 + 3х55 + 22.9m;
- piers 2-9 reinforcement via additional foundation of bored piles;
- within piers 4 and 6 deck spans per 110m were completed.
SCOPE OF WORK
‘Design stage’:
Stage of ‘Work documentation’:
- works regarding the bridge crossing reconstruction;
- bridge organization works;
Stage of ‘Work documentation’:
- pier’s foundation reinforcement design with truss of 110m fulfillment;
- structural technology design;
- SAC&D with MS design;
- financial estimation;
- technical supervision.
SIMILAR OBJECTS
BRIDGE CROSSING OVER THE ABAKAN RIVER ON 8 KM OF THE HAUL KAMISHTA-ALUMINIEVYA OF THE RAILROAD TRACK TOWARD SAYANOGORSK CITY
Bridge crossing reconstruction over the Abakan River on 8km of the haul Kamishta-Aluminevaya of railroad track toward Sayanogorsk City in Khakassia Republic after middle pier collapse together with two spans of 55m. Total length of the bridge crossing is 450m.