CLIENT
Federal Road Administration Taman
GENERAL CONTRACTOR
ООО  Transstroymechanizasiya
GENERAL DESIGNER
SC Institute Giprostroymost Saint-Petersburg
DESIGN STAGE
2021
CONSTRUCTION STAGE
2024
TECHNICAL FEATURES
Two stages of construction:
  • length of reconstruction lot – 4.625 km
  • length of new construction  – 114,552 km
  • total motorway length – 119,177 km

Sites of road construction:
  • Artificial structures including bridge crossings, flyovers and pedestrian crossings – 56 pcs
  • soundproof screens – 6.3 km
SCOPE OF WORK
  • general design
  • set of design and survey works
    • engineering and geodetic survey
    • engineering and geological survey
    • engineering and hydro-meteorological survey
    • environment survey
    • removal of explosive materials 
    • archeological and cultural survey
    • intersections survey
    • buildings and structures survey within designated lot
    • documentation preparation
  • documentation design and issue
  • construction site technical supervision
SIMILAR OBJECTS
SPEED HIGHWAY М-12
MOTORWAY А-289
Construction and reconstruction of Motorway A-289 Krasnodar – Slavyansk – Temryuk – Motorway A-290 Novorossiysk – Kerch  is composed of the old road renovation within area of Marianskaya Station up to link of M-4 Don with new detour of Krasnodar City to A-289 and next to new direction toward South around settlements up to transportation interchanges of Beliy Village of the road А-290 Novorossiysk – Kerch.
Our motorway should be completed with curves of large diameters with optimal slopes design plus vertical curves within areas of sophisticated roadway profile to ensure comfortable driving of motorists and smooth intersections with existing roads on various levels.